New: CEE Grid Procurement Pipeline 2027-2030 is available now. Free sample and 10 country editions →

COUNTRY EDITIONS

CEE Rail Build-Out 2027-2030: country editions

Any of 15 country editions on its own, with the same depth as the full report.

The rail report covers 17 markets. Estonia, Latvia and Lithuania are sold together with Rail Baltica as one Baltic states edition, so there are 15 rail country editions.

Order a country edition

Central Europe and the Baltic states

Poland

The region's deep market: about EUR 4.0bn of rail awards a year since 2023, with the CPK / Port Polska high-speed programme adding construction packages in 2027 and 2028.

Awarded since 2020
EUR 20.3bn
Base case 2027-2030
EUR 24.7bn

From £1,950

Czechia

EUR 1.6bn a year of TED-published rail awards since 2023, and a proposed 2027 investment budget for Správa železnic of about EUR 2.1bn.

Awarded since 2020
EUR 9.4bn
Base case 2027-2030
EUR 6.3bn

From £1,450

Romania

Large awards since 2020, peaking at EUR 4.1bn in 2022, with one lot in three cancelled: relaunches and delivery risk decide the bid.

Awarded since 2020
EUR 12.3bn
Base case 2027-2030
EUR 6.2bn

From £1,450

Baltic states and Rail Baltica

Rail Baltica dominates: the mainline framework and the energy contract are let, and future work arrives as staged orders.

Awarded since 2020
EUR 10.1bn
Base case 2027-2030
EUR 3.6bn

From £1,450

Hungary

Awards fell to under EUR 100m a year in 2023 to 2025; EUR 1.6bn of 2026 lots ended without award and wait for a relaunch decision.

Awarded since 2020
EUR 3.2bn
Base case 2027-2030
EUR 1.6bn

From £1,150

Slovakia

EUR 2.1bn awarded since 2020 and EUR 1.3bn of live procedures with a published value.

Awarded since 2020
EUR 2.1bn
Base case 2027-2030
EUR 2.2bn

From £1,150

South-East Europe

Greece

EUR 507m awarded on TED since 2020, while most of six competitive dialogues worth about EUR 4bn are still unawarded, so the 2027-2030 outlook runs from EUR 0.4bn to EUR 4.0bn.

Awarded since 2020
EUR 507m
Base case 2027-2030
EUR 1.2bn

From £1,150

Bulgaria

EUR 1.7bn awarded since 2020; the Sofia-Pernik-Radomir and Vidin-Sofia corridors carry the 2027-2030 pipeline, and cancellations are the main risk.

Awarded since 2020
EUR 1.7bn
Base case 2027-2030
EUR 1.8bn

From £1,150

Croatia

The largest South-East European market by awards: EUR 2.4bn awarded since 2020, EUR 1.07bn of it in 2026 alone, including the record EUR 677m Dugo Selo-Novska contract.

Awarded since 2020
EUR 2.4bn
Base case 2027-2030
EUR 0.9bn

From £1,150

Serbia

EUR 684m of EU-, EIB- and EBRD-financed awards on TED since 2020; the Belgrade-Niš modernisation is the main pipeline, and contracts signed outside TED are listed separately.

Awarded since 2020
EUR 684m
Base case 2027-2030
EUR 835m

From £1,150

Montenegro

The Bar-Vrbnica line is the market: a EUR 230m base case for 2027-2030 and a case study on what EU accession could change.

Awarded since 2020
EUR 40m
Base case 2027-2030
EUR 230m

From £1,150

North Macedonia

Corridor VIII's last section to Bulgaria, with the cross-border tunnel, has been out to tender since September 2026 (EUR 400m prior information).

Awarded since 2020
EUR 20m
Base case 2027-2030
EUR 420m

From £1,150

Albania

Durrës-Rrogozhinë (EUR 90m) is in evaluation, and the line from Vorë to the Montenegrin border carries Albania's largest EU grant.

Awarded since 2020
EUR 2m
Base case 2027-2030
EUR 458m

From £1,150

Kosovo

Rail Route 10 is the only programme: phases 1 and 2 are under way and delayed, and phase 3 to the Serbian border is in planning.

Awarded since 2020
EUR 2m
Base case 2027-2030
EUR 47m

From £1,150

Bosnia and Herzegovina

No large rail procedure on TED or in the IFI records yet; the Corridor Vc rail sections in the 2025 project pipeline have no confirmed financing.

Awarded since 2020
EUR 3m
Base case 2027-2030
EUR 8m

Price on request

Country figures are rounded and modelled country by country, so they may not add exactly to the regional base case of about EUR 50bn (Central Europe and the Baltic states about EUR 44bn, South-East Europe about EUR 6bn). Low and high cases are not additive across countries.

Need more than two countries?

The full regional report covers all 17 markets for £2,950, single user.

See the full report

CEE Grid Procurement Pipeline 2027-2030: country editions

See all Grid country editions

Poland

The largest grid market in the region: EUR 5.7bn awarded on TED since 2020, and 119 named packages expected to reach award in 2027.

From £1,950

See the edition

Czechia

EUR 4.5bn awarded since 2020, led by ČEPS (EUR 2.5bn) and ČEZ Distribuce (EUR 1.6bn).

From £1,450

See the edition

Romania

EUR 3.5bn awarded since 2020, with Transelectrica the largest buyer and single bids on three lots in ten.

From £1,450

See the edition

Greece

EUR 3.5bn awarded since 2020, and the highest published estimates for 2027 of the 12 EU markets: EUR 925m across 15 packages.

From £1,450

See the edition

Hungary

EUR 1.3bn awarded since 2020, led by ELMŰ Hálózati and MAVIR.

From £1,150

See the edition

Bulgaria

EUR 1.2bn awarded since 2020, and 92 named packages expected in 2027, second only to Poland.

From £1,150

See the edition

Slovenia

EUR 958m awarded since 2020, with the highest single-bid share of the 12 EU markets.

From £1,150

See the edition

Slovakia

EUR 342m awarded since 2020, 84% of it by the transmission operator SEPS.

From £1,150

See the edition

Croatia

EUR 265m awarded since 2020, with single bids on 37% of awarded lots with bid data.

From £1,150

See the edition

Baltic states

EUR 1.8bn awarded since 2020 across Estonia, Latvia and Lithuania, led by Litgrid (EUR 760m).

From £1,150

See the edition

Request a country

Need a country we do not cover yet? Tell us which one. We build it with the same method and reply within two working days with scope, price and a delivery date. New country editions start at £2,450 for a single user, with a quick turnaround.

All reports are in English. Hungarian and other language editions are available on request.